Advertisement

This page covers permit cost data for jurisdictions we've researched in detail. Cost data reflects publicly available fee schedules. Because fees are set locally and change frequently, always verify with the relevant jurisdiction before budgeting. Use the Permit Finder for more details on specific counties.

What STR Permits Typically Cost

$50–$100
Low-cost markets (rural counties)
$150–$350
Most common range
$500–$1,000+
High-regulation urban markets
+$100–$300
Typical inspection fee (where separate)

The Full Cost Picture: More Than Just the Permit Fee

When budgeting for STR compliance, the permit fee is just one line item. The full annual compliance cost for a vacation rental typically includes:

  • Annual permit / registration fee — the core cost covered in this table
  • Initial inspection fee — charged separately in some jurisdictions; often included in permit fee elsewhere
  • Reinspection fee — if you fail the initial inspection (typically $50–$150)
  • State license fee — Florida requires a DBPR license ($195–$295/year), Hawaii has similar requirements
  • Lodging/occupancy tax registration — usually free to register, but an administrative step
  • Business license — some cities require one separately from the STR permit (typically $25–$100/year)

For a four-bedroom cabin in Sevier County, TN, for example, total first-year compliance costs including permit fee, inspection, and tax registration setup might run $350–$500. Ongoing annual costs in year two and beyond typically drop to $250–$350 once the property is in the system.

STR Permit Fee Comparison by State and Jurisdiction

State Jurisdiction Annual Permit Fee Inspection Required? Inspection Fee State License? Notes
TN Sevier County (unincorp.) $250 base (≤12 occ.)
+$25/occupant over 12
Yes Included No Program launched Jan 2024. City properties need separate city permit.
TN Gatlinburg (City) $200 base (1–2 BR)
+$75/additional BR
Yes Included No R-1A and R-2A zones ineligible.
TN Nashville / Davidson Co. Varies (OO vs. NOO type) Yes Included No Owner-occupied and non-owner-occupied licenses have different rules and caps.
FL Statewide (DBPR license) $195–$295 Yes (DBPR) Included Yes — required Required for any property rented 3+ times/year under 30 days. Applies statewide.
FL Walton County Varies (contact county) No (county level) N/A Yes (DBPR) County reg also required. 24/7 local contact within 30 min required.
FL Osceola County Varies No N/A Yes (DBPR) Kissimmee / Disney area. High enforcement.
CA Marin County $300 new / $150 primary renewal No N/A No Waitlists in some townships. 2-year renewal cycle.
CA Placer County Varies Yes Included No Fire AND Defensible Space inspections both required. Common in Tahoe area.
CA Sonoma County See Permit Sonoma fee schedule No N/A No Certified property manager required for all vacation rentals.
CO Boulder County Varies by license type No N/A No Short-term and vacation rental licenses are separate categories.
CO Clear Creek County $160 (new, incl. inspection) Yes Included in $160 No Cap: max 4.5% of total housing units. Permits may not be available in capped areas.
NC Dare County Varies No N/A No Outer Banks area. Occupancy tax reg separate.
NC Brunswick County No fee (no permit req'd) No N/A No Unincorporated county only. Individual municipalities may require registration.
NV Washoe County Varies No N/A No STR ordinance adopted March 2021. Reno/Tahoe area.
SC Horry County Varies No N/A No Myrtle Beach city stricter than unincorporated county.
SC Beaufort County Varies No N/A No Hilton Head Island has its own rules vs. mainland.
TX Austin (Travis County) Varies by type No N/A No Type 2 (non-owner-occ.) permits very limited. Austin is highly regulated for STRs.
HI Honolulu / Oahu Varies No N/A No NUC (Nonconforming Use Certificate) required. Very limited availability. Resort zones only for most STRs.
HI Maui County Varies No N/A No Restricted to resort zones after 2023 legislation. Significant enforcement.

What Drives Permit Cost Differences?

Permit fees vary dramatically by jurisdiction for a few concrete reasons:

  • Occupancy-based vs. flat fee: Sevier County and some other jurisdictions scale fees to maximum occupancy. A 20-person cabin pays more than a 2-person cabin. Other jurisdictions charge flat fees regardless of size.
  • Bedroom-based fees: Gatlinburg and several California jurisdictions scale fees to bedroom count rather than occupancy. This tends to be more predictable for planning purposes.
  • Inspection costs: Where fire safety inspections are required, the cost is usually bundled into the permit fee. Reinspection fees, however, are almost always separate.
  • Cap systems: Jurisdictions with permit caps (Clear Creek County, CO; parts of Hawaii; Austin, TX for Type 2) often charge lower fees because scarcity limits demand rather than price — but the real cost is the waiting period or unavailability of permits.

Hidden Costs to Budget For

Beyond the permit fee itself, experienced STR operators budget for:

  • Inspection prep costs: Fire extinguisher replacement ($30–$80), CO detector installation ($25–$60 each), egress window hardware ($50–$200 per window if lofts are involved). Budget $100–$500 for inspection prep on an older property.
  • Property management surcharge: In jurisdictions requiring a certified property manager (Sonoma County, CA) or a local contact within 30 minutes (Walton County, FL), professional property management is effectively required — add $1,500–$5,000/year in PM fees to your compliance budget.
  • Tax registration and accounting: Lodging tax registration is typically free, but many hosts use a CPA or tax service to file quarterly. Budget $200–$500/year for tax compliance assistance if you're unfamiliar with TOT/TDT filing.

Markets Where Compliance Is Most Expensive

The highest total compliance cost markets we've researched are:

  1. Hawaii (Oahu/Maui): Extremely limited permit availability, waitlists, and post-2023 restrictions effectively ban most new non-resort STRs. If a permit is available, the restricted supply means any legal listing commands premium rates — but the compliance and legal barrier to entry is very high.
  2. Austin, TX: Type 2 (non-owner-occupied) STR permits in Austin have been effectively frozen. Legally operating a non-owner-occupied STR in Austin requires a grandfathered permit, which means purchasing an existing permitted property at a significant premium.
  3. California coastal counties: Marin, Sonoma, and Placer counties combine moderate permit fees with property manager requirements, fire+defensible space inspection requirements, and strict occupancy caps that limit revenue potential. Total compliance overhead is higher than fee schedules suggest.
  4. Florida (statewide): The two-layer DBPR + local requirement adds $200–$400 in state licensing costs on top of any local fees, plus annual DBPR inspection overhead.

Most STR-Accessible Markets in This Analysis

By contrast, the most accessible markets we've researched (as of 2025) from a pure permit cost and availability standpoint:

  • Sevier County, TN: $250 flat fee, straightforward application, no permit cap, relatively quick turnaround. The county is actively issuing thousands of permits annually.
  • Clear Creek County, CO: $160 inclusive of inspection. Simple process. The cap (4.5% of housing units) is worth monitoring but hasn't yet restricted most applicants.
  • Dare County, NC: One of the lower-cost Outer Banks jurisdictions with a relatively streamlined process.
Advertisement

Frequently Asked Questions

📌 Disclaimer

Fee data on this page is based on publicly available fee schedules and informational sources as of 2025. Fees change without notice. This page is for research and planning purposes only — always verify current fees with the relevant jurisdiction before applying or budgeting.

Want the full step-by-step for your county?

Use our interactive Permit Finder to get county-specific requirements, fee summaries, and official portal links.

Open Permit Finder →